Power
The building power is
supplied by two (2) separate grids from the Los
Angeles Department of Water & Power. Unlike most
buildings in downtown Los Angeles, this two-grid
system gives the Garland Building a distinct
advantage with the ability to switch to an
alternate grid in the event one fails. The
primary feed to the building is a preferred
service that receives priority over all other
grids in the event of an emergency.
|